Metal to window boxes and paint to walls
Written by Teemu Virtanen   
Wednesday, 20 January 2010 20:28
Print E-mail
Renovation of HKR coach

On the third weekend of January (15.-17.1.2010) the work on the coach continued with painting and preparing the structures for windows.

 

The ceiling of the second class got its final coat of paint. Some parts of the ceiling had to be still filled and snaded, so there are areas where more painting is required. The interior walls of the third class were primed with new light brown premier. The walls will be grained to imitate grain of oak wood.

 

The work on the third class benches continued with final filling, sanding and priming. Also these benches will be grained to reassemble oak wood, but with more yellow tone than on the walls. The second class seats will be upholstered.

 

The work with window openings continued by making a shet metal boxes under the windows. The opening windows can be lowered to these boxes and the water proof boxes will collect all the moisture and water which will be directed out with a copper piepe. This will avoid the water and humidity to damage the wooden structure of the car body.

 


Pictures of recent work

(you can get to the picture gallery by clicking thumbnails)


 


 



Voluntary events

<< February 2012 >> 
 Su  Mo  Tu  We  Th  Fr  Sa 
     1  2  3  4
  5  6  7  8  910
1314151617
19202122232425
26272829   

Search

Banner